Standard Operating Procedure (SOP) for Menting Point Instrument:
- Ensure that the melting point machine is clean and free from any residual material from the previous use.
- Connect the machine to a suitable power source and ensure that it is properly grounded.
- Calibrate the machine according to the manufacturer's instructions before use.
- Prepare a sample of the substance to be tested. The sample should be dry, finely powdered, and uniform in size.
- Fill a small amount of the sample into a melting point capillary tube, making sure that the tube is not overfilled and that the sample is evenly distributed.
- Set the temperature range as per the manufacturer's instructions and turn on the heating source.
- Observe the sample as the temperature increases and record the temperature range in which the sample begins to melt and the temperature at which it completely melts.
- Once the sample has melted, turn off the heating source and allow the apparatus to cool down.
- Clean the melting point capillary tube thoroughly with a suitable cleaning agent and rinse it with distilled water.
- Repeat the process for any additional samples.
- After all tests are completed, turn off the machine and disconnect it from the power source.
- Clean the machine thoroughly with a suitable cleaning agent and rinse it with distilled water.
- Store the machine in a suitable location, free from any potential damage or contamination.
0 Comments